- Walk the lot, site the house.
- Apply for permits.
- Stake out the house with batter boards.
- Excavate - Strip and save the top soil. Note: This is the only step where an unexpected cost may arrive, i.e.: rock, water, etc.
- Pour the footings.
- Perimeter drain tiles on the exterior of the footings for water
- Interior perforated piping for radon prevention.
- Foundation walls (Block, Precast Walls or Poured Concrete).
- Exterior Frame.
- 2 x 4 or 2 x 6 construction on exterior walls.
- Roof Framing
- Trusses or roof rafters.
- Basement & garage floors poured (May be earlier or later).
- Floating slab, alternative.
- Roof covering.
- Felt sheathing and shingles.
- Windows and doors.
- Exterior framing.
- Siding: Vinyl, Aluminum, Wood
- Masonry: Brick, Stone, Veneers, Drivit
- Mechanical rough-ins (wiring, Plumbing, Heat vents, etc.)
- Insulation / Air Infiltration.
- Drywall
- Fireplace(s)
- Masonry
- Gas
- Interior trim & Hardware
- Paint, Panel, Wallpaper.
- Flooring
- Install kitchen, baths cabinetry
- Driveway, Grading and Seeding.
- Walk-through
- Final payment
- Warranty.
|